Operated by
nLighten
nLighten Bridgend CWL1
Unit 3, Bridgend Science Park, Bridgend, Wales• CF31 3RP
Tier 3
Active
nLighten CWL1 Bridgend — 1,100 m² facility in South Wales with 1,500 kW of power. Provides low-latency edge compute for Welsh and South West England businesses. Part of nLighten's UK edge network.
1.5
megawatts
Power Capacity
11,840
sq ft raised floor
Floor Space
1.4
power usage effectiveness
PUE Rating
Facility Intelligence Report
Premium
0 verified data points · nLighten Bridgend CWL1
What is the site address?Not provided
What is the site latitude and longitude?Not provided
Is advance notice required for deliveries to site?Not provided
Are there security clearance requirements to enter the facility?Not provided
Are 3rd party contractors required to complete a site induction?Not provided
What is the data centre Tier classification?Not provided
What is the current PUE?Not provided
What is the uptime SLA for the facility?Not provided
Is the site located within a seismic zone?Not provided
Is a virtual tour available?Not provided
General Site Information
What is the site address?Not provided
What is the site latitude and longitude?Not provided
Is advance notice required for deliveries to site?Not provided
Are there security clearance requirements to enter the facility?Not provided
Are 3rd party contractors required to complete a site induction?Not provided
What is the data centre Tier classification?Not provided
What is the current PUE?Not provided
What is the uptime SLA for the facility?Not provided
Is the site located within a seismic zone?Not provided
Is a virtual tour available?Not provided
Overview
nLighten CWL1 Bridgend — 1,100 m² facility in South Wales with 1,500 kW of power. Provides low-latency edge compute for Welsh and South West England businesses. Part of nLighten's UK edge network.
Technical Specifications
Full Spec
Power Capacity
1.5 MW
Floor Space
11,840 sq ft
PUE Rating
1.4
Cooling Type
Air
UPS Configuration
N+1
Generator Backup
Yes — N+1 minimum
City
Bridgend
Connectivity & Carriers
BT
Virgin Media
Colt
Carrier-neutral access — multiple transit providers available on request
Certifications & Compliance
ISO 9001
Verified certification
ISO 14001
Verified certification
ISO 27001
Verified certification
ISO 45001
Verified certification
PCI DSS
Verified certification
Services Offered
Colocation
Connectivity
Cloud
Physical Security
Biometric Access
24/7 CCTV
Security Guards
Location & Proximity
Unit 3, Bridgend Science Park, Bridgend, Wales · CF31 3RP
Nearest Facilities
1
nLighten Bridgend
nLighten
Tier 2351m
1.5MW
2
nLighten Bridgend (CGI Campus)
nLighten
Tier 3360m
1.5MW
3
Vantage Bridgend Campus
Vantage Data Centers
Tier 3386m
148MW
4
Vantage Data Centers Bridgend Campus
Vantage Data Centers
Tier 3489m
120MW
5
nLighten Bridgend Science Park
nLighten
Tier 31.0 km
1.5MW
6
Vantage CWL21 (Boverton)
Vantage Data Centers
Tier 312.0 km
48MW
7
Keppel Cardiff Data Centre
Keppel Data Centres
Tier 325.0 km
10MW
8
Keppel Cardiff Data Centre
Keppel Data Centres
Tier 326.2 km
3.9MW
51.50820°N, 3.57710°WWales region
Facility Contact Details
Use the published operator details below to contact this facility directly.
Quick Facts
Price Range£
RegionWales
TierTier 3
CoolingAir
Certifications5
Ad
Your Brand Here
Express interest in a paid website ad spot alongside UK data centre content.
Explore Website AdvertisingAd
Website Advertising Opportunities
Introduce your brand alongside data centre facility profiles.
Register Interest