48
megawatts
Power Capacity
300,000
sq ft raised floor
Floor Space
1.2
power usage effectiveness
PUE Rating
2025
year established
Year Built
Facility Intelligence Report
Premium
0 verified data points · Vantage London
What is the site address?Not provided
What is the site latitude and longitude?Not provided
Is advance notice required for deliveries to site?Not provided
Are there security clearance requirements to enter the facility?Not provided
Are 3rd party contractors required to complete a site induction?Not provided
What is the data centre Tier classification?Not provided
What is the current PUE?Not provided
What is the uptime SLA for the facility?Not provided
Is the site located within a seismic zone?Not provided
Is a virtual tour available?Not provided
General Site Information
What is the site address?Not provided
What is the site latitude and longitude?Not provided
Is advance notice required for deliveries to site?Not provided
Are there security clearance requirements to enter the facility?Not provided
Are 3rd party contractors required to complete a site induction?Not provided
What is the data centre Tier classification?Not provided
What is the current PUE?Not provided
What is the uptime SLA for the facility?Not provided
Is the site located within a seismic zone?Not provided
Is a virtual tour available?Not provided
Overview
New hyperscale campus under construction, set to be one of Europe's largest.
Technical Specifications
Full Spec
Power Capacity
48 MW
Floor Space
300,000 sq ft
PUE Rating
1.2
Cooling Type
Free Cooling
UPS Configuration
N+1
Generator Backup
Yes — N+1 minimum
Year Built
2025
City
Cardiff
Connectivity & Carriers
LINX
Megaport
Zayo
Colt
BT
Virgin Media Business
Carrier-neutral access — multiple transit providers available on request
Certifications & Compliance
ISO 27001
Verified certification
ISO 9001
Verified certification
ISO 14001
Verified certification
ISO 45001
Verified certification
ISO 50001
Verified certification
SOC 1 Type II
Verified certification
SOC 2 Type II
Verified certification
Services Offered
Hyperscale
Colocation
Location & Proximity
Powergate Business Park, Voltas Avenue, North Acton, Wales · NW10 6PH
Nearest Facilities
1
Proximity Data Centres Cardiff
Proximity Data Centres
Tier 3861m
4MW
2
LINX Wales (Stadium House Cardiff)
LINX NoVA
Tier 31.6 km
2MW
3
OnQ Group Cardiff DC
OnQ Group
Tier 21.7 km
2MW
4
NEXTDC Cardiff
NEXTDC
Tier 31.8 km
5MW
5
Latos Cardiff Hyperscale
Latos
Tier 32.5 km
90MW
6
Keppel Cardiff Data Centre
Keppel Data Centres
Tier 33.3 km
3.9MW
7
Keppel Cardiff Data Centre
Keppel Data Centres
Tier 34.1 km
10MW
8
Microsoft Newport (CWL01)
Microsoft
Tier 311.4 km
180MW
51.46920°N, 3.16250°WWales region
Facility Contact Details
Use the published operator details below to contact this facility directly.
Quick Facts
Price Range££££
RegionWales
TierTier III
CoolingFree Cooling
Certifications7
Ad
Your Brand Here
Express interest in a paid website ad spot alongside UK data centre content.
Explore Website AdvertisingAd
Website Advertising Opportunities
Introduce your brand alongside data centre facility profiles.
Register Interest



